Survey and technical feasibility studies for UTE CCG Novo Tempo (Brazil)
returnClient: GE Power Systems
About the project
ATD Group conducted a road and river route survey, and detailed engineering studies of transportation to main parts, turbine and steam and gas generator, and main steam boiler modules, enabling the project logistics for UTE CCG-Novo Tempo (Recife/Pernambuco - Brazil), supporting the consortium General Eletric and Duro Felguera in its technical and commercial proposal.