Projects
Showing projects with tag: Thermoelectric. X

Logistics contract O&M Transmission Lines - IE Madeira (Brazil)
Client: IE Madeira About the project ATD carried out the international and national logistics of the materials and components required for the Bi - Poles and Substations of...

Logistic support services for assembly - UTE CCG Parnaiba I (Brazil)
Sbout the project: Site to CCG foundation – Combined Cycle Gas, Parnaíba I – Unit I (Santo Antônio dos Lopes, Maranhão) ATD Group was...

Generator Salvage – UTE CCG Parnaiba II (Brazil)
Client: INITECSA (Generator salvage operation – CCG Parnaiba II. Santo Antônio dos Lopes, Maranhão - Brazil). ATD Group was resposible for the...

Engineering study for turbine / generator lifting in UTE CCG Los Rulos (Chile)
Client: Duro Felguera Sobre o projeto ATD Group carried out a general study of engineering and layout of turbine and generator lifting operations for Duro Felguera,...

Survey and technical feasibility studies for UTE CCG Regas (RS - Brazil)
Client: GE Power Systems About the project ATD Group was responsible for a survey of the road route, structural and geometric adaptation works, and detailed engineering...

Survey and technical feasibility studies for UTE CCG Regas (BA - Brazil)
Client: GE Power Systems Sobre o projeto ATD Group carried out a survey of the road route, structural and geometric adaptation works, and detailed engineering studies of...

Survey and technical feasibility studies for UTE CCG Novo Tempo (Brazil)
Client: GE Power Systems About the project ATD Group conducted a road and river route survey, and detailed engineering studies of transportation to main parts, turbine...