Engineering study for turbine / generator lifting in UTE CCG Los Rulos (Chile)
return
Client: Duro Felguera
Sobre o projeto
ATD Group carried out a general study of engineering and layout of turbine and generator lifting operations for Duro Felguera, supporting the technical and commercial proposals for the EPC of the CCG - Los Rulos UTE (Chile).