National and international logistics for FPSO - TUPI BV P67 & P70 cargoes Client: COOEC International Ltd (China).About the projectATD Group was responsible for the comprehensive execution of packaging,...
Logistics contract O&M Transmission Lines - IE Madeira (Brazil) Client: IE MadeiraAbout the projectATD carried out the international and national logistics of the materials and components required for...
Logistic support services for assembly - UTE CCG Parnaiba I (Brazil) Sbout the project: Site to CCG foundation – Combined Cycle Gas, Parnaíba I – Unit I (Santo Antônio dos...
Generator Salvage – UTE CCG Parnaiba II (Brazil) Client: INITECSA (Generator salvage operation – CCG Parnaiba II. Santo Antônio dos Lopes, Maranhão -...
Engineering study for turbine / generator lifting in UTE CCG Los Rulos (Chile) Client: Duro FelgueraSobre o projetoATD Group carried out a general study of engineering and layout of turbine and generator lifting...
Project to improve handling operations of nacelle G114 in multimodal transport Client: GAMESAAbout the projectATD Group developed a project to improve handling operations of nacelle G114 in multimodal transport.
Survey and technical feasibility studies for UTE CCG Regas (RS - Brazil) Client: GE Power SystemsAbout the projectATD Group was responsible for a survey of the road route, structural and geometric adaptation...
Survey and technical feasibility studies for the Natural Gas Processing Unit - UPGN / COMPERJ (I - Brazil) Client: COBRA do Brasil
Survey and technical feasibility studies for UTE CCG Regas (BA - Brazil) Client: GE Power SystemsSobre o projeto ATD Group carried out a survey of the road route, structural and geometric adaptation works, and...
Survey and technical feasibility studies for the Natural Gas Processing Unit - UPGN / COMPERJ (II - Brazil) Client: Fluor Daniel
Survey and technical feasibility studies for UTE CCG Novo Tempo (Brazil) Client: GE Power Systems About the projectATD Group conducted a road and river route survey, and detailed engineering studies of...
Materials import services for assembly of reactors in the Pimental UHE Unit (Brasil) Cliente: Andritz Hydro About the project ATD Group conducted the logistical operations on imports from Germany and Italy of...
Logistic feasibility study and tax plan for EPC - Photovoltaic power station (Brazil) Client: IBERDROLAAbout the projectATD Group carried out the logistic feasibility study and tax plan for EPC for the Photovoltaic power...
Logistic feasibility study and tax plan for EPC - Photovoltaic plant - Guaiambé (Brazil) Client: COBRA EnergiaAbout the projectATD Group carried out the logistic feasibility study and tax plan for EPC - Photovoltaic plant in...
Logistic feasibility study and tax plan for EPC - Photovoltaic power station Pereira Barretos (Brazil) Client: FOTOVATIO – FRVAbout the projectATD Group carried out the Logistic feasibility study and tax plan for EPC - Photovoltaic...